This outdated pier located on Bass River had a total rebuild from start to finish. Our construction crews upgraded the pier with IPE hardwood decking. This material will provide a long-term maintenance free and quality finish on this pier for the duration of its lifespan. The pier was reconstructed with additional features including larger floats, handrails, and a bench / storage locker.